Building Up Reaching Out (BURO) Update
(Pictures below)
  • Please park in the Lesher parking lot (Sunday only), along Ellis and Lake, and around our building.
  • If you need assistance into the building, please come around back to the office doors (double glass doors off of Lake Street) for assistance.
  • Construction UPDATE.

    How can you get involved? Use your connection card on Sunday or call the church office (484-4053) about the following opportunities:
  • Blessing the workers with a monthly meal. Katie Coffin is heading this up.
  • Weekly cleaning of the indoor portion of the construction site
  • Ann Serna is heading this up.
  • Please call the office or sign up on the connection card on Sunday.
  • Cleaning is expected to happen Friday afternoon/evening or Saturday
  • Prayer times for the workers - Sundays at 5pm, Tuesdays at 6am, & Thursdays at 5:15pm

  • PATIENCE and FLEXIBILITY (Awe and Wonder) will be the themes for us the first half of 2008 as our normal routines will be disrupted by the construction.

    Thanks for your support in these areas!


    Pictures of the Progress!
    (scroll down to start from the Ground Breaking Ceremony, click on pictures to enlarge)

     

     

    What it will look like when finished!

    Aerial View Aerial View Exterior Front Exterior Front 2 What the outside will look like Inside view Early Childhood
     
    (1-7) of 7
     

    July 28-August 1

    Getting the parking lot ready Walls for water retention Cabinets in Infant area Nursery laundry area Foyer & balcony walkway Balcony Entrance View from the mezzanine Fireside room
    Windows in Fireside room Admin hallway
     
    (1-10) of 10
     

    July 21-25 Progress Everywhere

    Reception Window Foyer 0723 Fireside Room 0723 Curbing Balcony Entrance 0723 Door to 2 Story wing
     
    (1-6) of 6
     

    July 14-18 The Cross Is Up

    Foyer 0716 Foyer 0717 Office Interior 0717 Part of youth ministry offices Early Childhood Hallway Lifting the Cross The cross in position Parking lot torn up
    Exterior of Fireside Room View from across Prospect
     
    (1-10) of 10
     

    July 6-12th - Lots Of Activity

    Preparing for the roofing Sprinkler system in Worship Center Ceiling tile grid and lights Painting the Office woodwork for Mark's Office Woodwork for Mark's office Installing Roofing Installing Roofing
    New Front New Front New Front Foyer Foyer Foyer Storage room Rolling Shutter in Offices
    Cabinets in workroom Cabinets in workroom New doors in hall by offices Sidewalk by Early Childhood Retaining wall by HVAC Bricking up the foyer Finishing touches to the fireplace Foyer with new mezzanine
    Stairs to mezzanine
     
    (1-25) of 25
     

    June 30-July 3 A Short Week

    Wide view Wide View 2 Ellis Street and parking lot Another wide view
     
    (1-4) of 4
     

    June 22-27

    Mezzanine 0623 Brickwork 0623 East Exterior 0623 East Exterior 0625 Front 0624 Early Childhood Brick finished Cabinets arrived Early Childhood Hall 0627
    Office hallway 0627 Youth office hall Foyer 0627 Main Entrance 0626 Highest part of roof Facade 0627 Facade framing 0627
     
    (1-15) of 15
     

    June 16-20 Roof Goes On

    Roof 0620 View from 2 Story 0618 View From 2 Story roof 0620 Roof Framing 0620 Foyer 0618 Fireplace 0619 Main Entrance 0618 Main Entrance 0620
    Nursery East 0620 Front 0620
     
    (1-10) of 10
     

    June 9-13 More Steel

    Fireplace 0610 Mezzanine 0610 Stairs 0610 Steel 0610 Main Entrance 06/10 Main Entrance2 06/10 Weekday Entrance Rooftop Work 0613
    Roof Framing 0613 Early Childhood Room 0613
     
    (1-10) of 10
     

    June 2-6 Slab poured, Steel going up

    Worship Center back wall gone! New Back of Worship Center SW Corner of Worship Center Early Childhood Area Hall 0603 Slab Poured Steel 0603 From New Early Childhood Area Roof Don't Look Down
    View from roof of Worship Center Steel 0606 View From 2 Story roof 0606
     
    (1-11) of 11
     

    May 26-30 Drywall and Electrical

    Back of New Addition 0528 Back of New 0528 Nursery addition 0528 Half wall 0529 Back Hallway Craig's Office New Windows Conduit 0528
    Conduit2 0528
     
    (1-9) of 9
     

    May 19 - 23 Office Framing, Backfill

    Walls Down 0519 Walls Down Old Reception Area 0519 Walls Going Up 0520 Office Framing 0519 Wes' Future Office Early Childhood Framing 0521 Early Childhood Area 0522
    Mothers' Room 0523 Backfill
     
    (1-10) of 10
     

    May 12 - 16 Interior Framing and HVAC

    Nursery side 05-12 Nursery side 05-15 The front is enclosed Interior Nursery framing HVAC trench 05-06 HVAC 05-15 HVAC perspective More HVAC
    Former Lounge Former Offices 05-13-08 Future Offices Windows gone Walls Disappearing New back wall
     
    (1-14) of 14
     

    May 5 - 9, Walls begin to take shape

    Windows and cabinets gone 5/06 Old office door and window Additional Roof Support Nursery 5/09 Nursery roof Nursery Exterior 5/09 Nursery Exterior 5/08 Back Parking Lot
    Lake Street 5/09 Fireplace Rock Work 5/08 Finishing up the rock Overview 5/06 Rock Corner 5/09 Stone Tower 5/09
     
    (1-15) of 15
     

    April 28-May2

    Nursery Framing The Lounge Looking from the lounge thru the offices Former reception area Removing carpet Plastic Wall Plastic hall Outside
    Tower and sign Cutting Lake Street
     
    (1-10) of 10
     

    April 21-26 Offices Move

    Bricks fireplace Future Foyer Laying Concrete Nursery Floor Nursery Framing Office Move Lounge Demo
    Office stuff Wrestling with a cabinet Moving Out Temp Office Temporary Reception Area Wall Progress Rock 4-23 Making progress on the rock
     
    (1-16) of 16
     

    April 15-18 Brickwork almost done, HVAC units in

    Overview 0417 Preparing for slab Slab poured New HVAC Units Decking going on Stairwell continues to get higher Stairwell Sky View
    Fireplace Columns
     
    (1-10) of 10
     

    April 10 - 14 Progress continues

    HVAC crawl space Working on the crawlspace New framing in the nursery Potential patio Looking through the nursery Overview Scaffold Stairwell
    Future Storage Hard at work
     
    (1-10) of 10
     

    April 4-9 Walls Going Up!

    Beginning Walls Moving Scaffold Activity Scaffolding and Walls Progress Frames New Units Interior Electrical
    New Exterior Electricla
     
    (1-9) of 9
     

    April 2, 3

    Electrical work Blocked up window Partial wall removed New outline Windows removed Former door to 2 story wing Sample wall
     
    (1-7) of 7
     

    March 28 - April 1 Windows Missing

    Window disappearing Two Story window coming out More windows gone Drainage ditch New opening Temporary Door Construction Scaffolding
     
    (1-8) of 8
     

    March 27 - Nursery Demolition

    New Electrical Water Heater Missing Window Hallway Temporary Wall Cutting Door Nursery View West
    View East Backfill
     
    (1-10) of 10
     

    March 20-25 Work Inside and Out

    Nursery Foundation Backfill in progress Foundation Ductwork exposed Ceiling tiles down End room of early childhood wing Noah's Ark room Infant Room
     
    (1-8) of 8
     

    March 19

    Filling Forms Overview 2 Story View Moving Sheds Sheds
     
    (1-5) of 5
     

    March 14 - Outline Complete

     
    (1-7) of 7
     

    March 13 - More Footings Poured

     
    (1-4) of 4
     

    March 10 & 11 - Forms Removed

     
    (1-7) of 7
     

    March 5,6,7 - Pouring Concrete

     
    (1-5) of 5
     

    March 4 - Rebar Grid is Built

    Beginning of rebar Outline of new lounge More outline More Forms Rebar Grid Larger view of rebar grid New meets old Extra dust protection
     
    (1-8) of 8
     

    March 3 - Forms Are Added

    Rooftop view of forms Another rooftop view Measuring View from top of Worship Center More of the work site More work on remainder of stairs Downspout extension Electrical being worked on
     
    (1-8) of 8
     

    February 27 & 28 Pouring Begins

    More Digging Taking Measurements Pouring Concrete Finishing the row New Foundation